Over the period from August 2020 to January 2022, Adi Associates conducted a study to determine the change in the ambient noise levels in Birżebbuġa following the implementation of measures to control noise emissions from operations at the MFT since 2015. The study involved taking a series of noise measurements at selected locations over the period August 2020 to May 2021, and comparing these with measurements taken at the same locations in 2014 / 2015. The report of the study was submitted for consideration by the Environmental Management Committee of the MFT in January 2022.
Adi Associates had previously conducted a year-long study (over the period February 2014 to January 2015) to ascertain the noise impacts of the MFT on the residents of Birżebbuġa. The conclusions of the 2014 / 2015 study included the identification of noise control measures to be implemented by the MFT over the short and longer-term period. The MFT subsequently implemented a number of these measures.
Â
Â
Client:Â Malta Freeport Terminals (MFT)
Start / Finish Dates:  August 2020 – January 2022
We use cookies to analyse our website traffic. By clicking "accept All' or by continuing your visit on adi-associates.com, you consent to our use of such cookies and our Privacy Policy