CONTACT US t: +356 21 378 172
Client: WasteServ Ltd
Start / Finish Dates: April 2011 – April 2012
The project involved the formulation of an Environmental Monitoring Plan (EMP) for a non-hazardous waste disposal facility as required by a condition of the Integrated Pollution Prevention and Control (IPPC) permit issued for the facility by the Malta Environment and Planning Authority (MEPA). The EMP addressed: groundwater quality; coastal water quality; gaseous emissions; and ambient air quality.
Keywords: Environmental Monitoring Plan, Integrated Pollution Prevention and Control (IPPC), non-hazardous waste disposal facility