CONTACT US t: +356 21 378 172
Client: Grand Harbour Regeneration Corporation Plc
Start / Finish Dates: May – June 2010
The project involved identification of the known and potential environmental liabilities at the site, and the establishment of a methodology for the decommissioning of the structures in use at the bus refuelling station at the Valletta Bus Terminus. A visual inspection of the site (a walkover survey) was undertaken to identify potential surface contamination. The Decommissioning Plan included the formulation of waste management guidelines.
Keywords: Decommissioning Plan, bus refuelling station, Valletta Bus Terminus