CONTACT US t: +356 21 378 172

Client: Vassallo Concrete Services Ltd
Start / Finish Dates: August 2014
The consortium engaged to carry out the construction of the Mechanical Biological Treatment plant at Ghallis commissioned Adi Associates to support it in preparing the documentation required as part of the Integrated Pollution Prevention and Control (IPPC) application for the facility.
Adi Associates supported the consortium in carrying out a Best Available Technique (BAT) assessment to identify how the plant compared with BAT as defined in the BAT Reference documents (BREFs) published by the European Commission. The BREFs considered covered waste treatment industries, storage, and energy efficiency.