Study to gauge the effectiveness of noise control measures introduced by Malta Freeport Terminals (MFT) to reduce noise impacts on the residents of Birżebbuġa from the operations of the MFT
Over the period from August 2020 to January 2022, Adi Associates conducted a study to determine the change in the ambient noise le -
Diving Strategy for the Maltese Islands
Adi Associates has recently finalised Malta’s new diving strategy - Developing A Sustainable Diving Industry in the Maltese Isla -
Water Catchments in Malta and Gozo
Over the past year Adi Associates have been busy implementing part of the LIFE 16 IPE MT 008 Project on the Optimisation of the im -
MedIsWet
The Mediterranean Island Wetlands network project funded by MAVA is coordinated by WWF Greece and is made up of 13 partners. The -
Facility for the Care of the Elderly and Nursing Home, Naxxar
Adi Associates was commissioned to carry out an Environmental Impact Assessment (EIA) for the construction of a 234-bed facility f -
Fuel filling facility for Road Tankers
Enemed Ltd, a company that is responsible for the importation, distribution and wholesale of petroleum products for the inland mar -
Mrieħel Towers Commercial Complex, Mrieħel Industrial Estate
Adi Associates was commissioned to carry out an Environmental Impact Assessment (EIA), a Traffic Access Study, and a Traffic Impac -
Malta’s Transport Strategy 2050 and the Transport Master Plan 2025
Adi Associates were commissioned by the Ineco-Systematica Consortium to prepare a Strategic Environmental Assessment and an Approp -
Proposed High-rise hotel at Fort Cambridge
An air quality study and a Traffic Impact Assessment were prepared to address the potential impacts from the operational aspects o