CONTACT US t: +356 21 378 172
-
Malta’s Transport Strategy 2050 and the Transport Master Plan 2025
Adi Associates were commissioned by the Ineco-Systematica Consortium to prepare a Strategic Environmental Assessment and an Approp -
Dredging at Cirkewwa
A Project Description Statement was prepared for the proposed development, involving dredging works, to allow the use of Berth 3 a -
Reconstruction, Upgrading, Widening and Realignment of the Coast Road
Transport Malta intends to redevelop the Coast Road, namely the stretch from St Paul’s Bay to Pembroke. This section of the Coas -
Re-planning and modification of a villa at Il-Kantra ta’ Mgarr ix-Xini, Sannat
The Scheme consisted of the re-planning of an existing living space and the construction of a pool and reservoir, all within the e -
Agricultural room and garage at Ta’ Bajtra, Zurrieq
The project consisted of a proposed development involving the construction of a room for pesticides and a garage for agricultural -
Hotel Extension at Mellieha Bay
The project involved the extension of the hotel to provide for an additional 340 guest rooms (an approximate doubling of capacity) -
Ghajn Rihana – Salina Storm Water Project
Appropriate Assessment (AA) was undertaken in order to assess the impacts of the Scheme on the SPA of International Importance and
