Category Archives: Finished job
2021 Editors’ Choice for paper co-authored by Adi Associates Directors
In 2021 Adi Associates Directors, Adrian Mallia and Rachel Xuereb, co-authored a paper entitled Numerically enhanced conceptual modelling (NECoM) applied to the Malta Mean Sea Level Aquifer that was published in the Hydrogeology Journal. Read more..
Posted in Adi Associates
IPPC permit for DDE Attard Ltd approved by ERA
The Environment and Resources Authority (ERA) recently approved the Integrated Pollution Prevention and Control (IPPC) permit for DDE Attard Ltd, a waste management facility in Luqa. Read more..
Posted in Adi Associates
EIA for a fuel filling facility for Road Tankers
Enemed Ltd, a company that is responsible for the importation, distribution and wholesale of petroleum products for the inland market, including the aviation sector in Malta, has commissioned Adi Associates to prepare a number of studies for the relocation of the 31st March fuel installation at Birżebbuġa to a site in Has-Saptan, l/o Ħal Għaxaq. Read more..
Posted in Adi Associates
Strategic Environmental Assessment and Appropriate Assessment for the National Transport Strategy 2050 and the Transport Master Plan 2025
Adi Associates were commissioned by the Ineco-Systematica Consortium to prepare a Strategic Environmental Assessment and an Appropriate Assessment on Malta’s Transport Strategy and the Transport Master Plan. Read more..
Posted in Adi Associates
PAMA Shopping Village opens its doors
The PAMA Shopping Village opened its doors to the public on the 26th October 2015. The Shopping Village is a large retail complex located along the fringes of Mosta. Read more..
Posted in Finished job
EIA for the Rehabilitation of the Fisheries Port in Berbera, Somaliland concluded
Adi Associates has recently finalised the Environmental Impact Assessment (EIA) for the rehabilitation of the fisheries port in Berbera, Somaliland. The project, which commenced in January 2015, included a topographic survey of the port area and its surroundings, noise surveys, a bathymetric survey of the fishing port’s basin, a geotechnical survey, chemical analysis of seabed sediments, a sub-bottom profile survey, and stakeholder consultations. Read more..
Posted in Adi Associates
Camel Brand factory relocation approved
The MEPA Board recently approved the relocation of the Camel Brand factory from its current location in a residential area in Haz-Zebbug to Tal-Handaq. Camel Brand is a local company specialising in typical Maltese and Mediterranean delicacies, including ħelwa tat-tork, bigilla and sun-dried tomatoes. This relocation will enable the company to improve its operations and also allow for future potential expansion. Read more..
Posted in Finished job
Preparation of Natura 2000 Management Plans comes to an end
Over the past few weeks, Adi Associates Environmental Consultants Ltd together with international firm Epsilon International SA concluded the preparation of Management Plans for the terrestrial Natura 2000 sites for the Maltese Islands on behalf of MEPA. The preparation of the plans involved a number of surveys and data gathering exercises. This data was evaluated and used to produce conservation objectives for each site. Read more..
Posted in Finished job
Adi prepares Bathing Water Profiles
Adi Associates has recently prepared, on behalf of the Environmental Health Directorate, detailed bathing water profiles covering all the bathing areas of the Maltese Islands. A total of 29 bathing water profiles were prepared in accordance with the requirements of Legal Notice 125 of 2008 and of the Commission’s Bathing Water Profiles: Best Guidance and Practice, December 2009. Read more..
Posted in Finished job